Mutual Transfer Procedure |
Some Important Activities and Prescribed Time line issued by Railway Board on Inter Railway Mutual Transfer - RBE 131/2017 are given below.
Railway
Board Order on Inter Railway Mutual Transfer –RBE 131/2017
In Continuation of office letter of
even number dated 15.09.2017(R.B.E. 130/2017), the procedure for Mutual
Transfer is further simplified. Hereafter, for Divisionally controlled Posts,
application for Mutual Transfer duly signed by both applicants in proper
format, from a Division of one Railway to Division on another Railway need not
routed through the HQ offices. It shall be dealt directly only by the Divisions
concerned. For HQ controlled posts, the prevailing procedure shall continue.
Activity
and prescribed Timeline
SN
|
Activity
|
Timeline
|
01
|
Forwarding of Applications by Supervisors to the
Personnel Department of the Division:
It should be
verified at this stage that the prescribed application.
Form is
complete in all respects duly signed by both employees and the information
given therein is correct.
|
10 days
|
02
|
Forwarding by Divisional Personnel Department:-
Division controlled posts:-
Divisional
Personnel Department will forward the request application with necessary
documents directly to the Division concerned to which transfer is sought. The
name and designation of the officer signing the letter should be invariably
be mentioned in 15days the forwarding letter.
|
15 days
|
HQ controlled Posts:-
Personnel
Department will forward the application with all necessary documents to Zonal
HQ (CPO office).
Forwarding by Headquarters Personnel Deptt.
(for HQ controlled posts):-
On the
receipt of the application duly forwarded from Division/Workshop, the HQ
Personnel Department office will forward it to the Zonal Rly/PU concerned.
|
15days
|
|
Note:-Mutual Exchange is
between two employees of the same grade cadre. This must be verified by the
Personnel Department at every stage of processing of application
|
||
03
|
Conveying of Acceptance:- the counterpart
HO/Division to issue their acceptance to forwarding HO/Division(as the case
may be)
|
10 days
|
04
|
Issue of transfer order: - On receipt of consent from
the receiving HQ/Division, the transfer orders should be issued.
|
10 days
|
05
|
Reliving/sparing:- Once the transfer order is
issued, employees should be relieved immediately with the senior employee
being relieving first. This will be the responsibility of Branch Officer/Head
of Department concerned under whom the staff is working (Boards letter
No.ERP/Portal Transfer/2013 dated 30.04.2014 and No.E(NG)I-2007/TR/26 dated
04.12.2007 refers).
|
15 days
|
06
|
Dispatch of
LPC and Service Records: - Personnel Department concerned should ensure that
the LPC and Service Record of the employee(s) are sent expeditiously to the
new Division/Zone etc. in terms of Board’s letter number E(NG)I-2001/TR/16
dated 21.11.2001.Attested Xerox copy of the Service Record should be given to
the employee concerned.
|
15 days
|
Note (i) At the stage of
forwarding of applications, files need not routed through concerned Branch
Officers/HODs concerned in Division/HQ shall be done at the stage of
relieving only.
|
||
As the mutual transfers
are ordered with the consent of both the employees, it should be made clear
right at the time of forwarding applications that no request for backtracking
from the mutual exchange arrangement will be entertained under any
circumstances(Board’s letter No.E(NG)I-2006/TR/6 dated 21.04.2006 refers)
|
||
07
|
It may specifically be
noted that forwarding of application cannot be done by any level lower than
the Divisional Personnel Officer (DPO) or Sr.DPO in the Division and WPO in
the Workshops. Dy.CMMs,WMs,AENs and other such Officers/Units should
invariably route the request application through their Corresponding Personnel
Officer and should not forward any application to other Division/Unit
directly.
|
No comments:
Post a Comment